Contract Manufacturing
Custom internal systems for contract manufacturers whose quoting and scheduling still run on tribal knowledge.
A contract shop is a promise factory. Every job is a promise made in a quote, renegotiated through revisions, scheduled against finite machines and people, and proven at final inspection. The office estimates from memory, the floor runs from a whiteboard, and the truth about whether a job made money arrives weeks after the parts shipped. The work is too specific to your shop for generic software—and too important to keep in people’s heads.
Praxyt builds the internal systems that connect the front office to the floor: RFQ intake, quote history, revision control, job packets, capacity-aware scheduling, and quality workflows—built around how your shop actually runs.
The software already in the building
Most contract manufacturers run a manufacturing ERP or MRP—often a shop-oriented system chosen for job tracking—plus accounting, quoting spreadsheets, a shared drive full of drawings, and maybe a quality module nobody opened twice. Estimating lives in a workbook built by whoever has been here longest.
Where that software stops
The ERP records jobs, inventory, and invoices. It does not collect the drawing package before the quote goes out. It does not warn that a repeat job lost money last time. It does not know the laser is down for maintenance Thursday or that the only inspector is on vacation next week. The scheduling module assumes routings are maintained and data entry is disciplined; in most shops, neither is true, so the schedule quietly migrates to the whiteboard and the ERP becomes a place where history is filed.
What we see in the field
The workflows that hurt first
RFQs arrive everywhere and die somewhere
Requests for quote come in by email, phone, customer portals, and the occasional napkin sketch. There is no single intake log, no response clock, and no way to see which RFQs are waiting on drawings, which are being estimated, and which were simply forgotten.
Drawing collection and revision roulette
The quote goes out against revision C while the shop is holding revision B and the customer just emailed revision D to one salesperson. Drawing packages live in inboxes and shared drives, and “which rev are we building?” is answered by walking to the floor.
Quote history is archaeology
Answering “what did we quote this part last time—and did we make money on it?” means digging through old emails and spreadsheets. Win and loss reasons are never captured, so every repeat RFQ starts from memory instead of evidence.
Job packets assembled by hand
Travelers get printed, drawings get stapled, BOMs come from a different system, and certs get photocopied at the last minute. A missing page stops a machine; a wrong page ships the wrong rev.
Capacity planning is a whiteboard
The schedule assumes every machine, welder, and work center is always available. Promise dates are negotiated from optimism, and the first real picture of the week appears when the floor lead updates the whiteboard on Monday morning.
Scrap and rework vanish into the floor
Parts get scrapped or reworked with a reason nobody writes down. There is no trail from a nonconformance back to the setup, the material lot, or the operator note that would prevent the next one.
Estimated versus actual is a quarter-end guess
Job costs are known only after accounting closes the month. By the time anyone learns a part family loses money, the customer has already sent the repeat order at the old price.
Example systems
What Praxyt could build for a contract manufacturer
- RFQ intake and pipeline—one log, drawing checklists, response clocks, and follow-up queues
- Quote builder with searchable history, current material cost roll-ups, and win/loss capture
- Revision control tying quotes, job packets, and shop documents to a single drawing rev
- Digital job packets—traveler, BOM, drawings, certs—released to the floor as one package
- Capacity planning board that knows about machine availability, staffing, and outside operations
- Production schedule with due-date risk flags instead of a whiteboard and good intentions
- Quality workflow for in-process checks, nonconformances, and scrap or rework reason codes
- Estimated-versus-actual job performance dashboard fed by time and material actuals
Concept interface
RFQ & Job Packet Board
Every open RFQ and released job in one place: what it is waiting on, which revision is current, and where it stands against its promise date.
RFQ & Job Packet Board
Concept interface — illustrative data, not a live system
| Job / RFQ | Customer | Drawing package | Promise date | Next action | Status |
|---|---|---|---|---|---|
| RFQ-2214 | Alloy Systems | Rev C — awaiting spec sheet | Quote Fri | Chase customer for spec | Customer update due |
| RFQ-2219 | Prairie Ag Equipment | Complete, Rev A | Quote Thu | Confirm material quote | Vendor response overdue |
| JOB-1047 | Meridian Medical | Rev B — locked to packet | Ship Tue | Final inspection docs | Ready pending inspection |
| JOB-1052 | Halloran Energy | Rev D on floor — quote was Rev C | Ship Fri | Re-quote at Rev D before ship | Margin below approval threshold |
| JOB-1058 | Turner Fabrication | Complete, Rev A | Ship next Wed | Outside op PO confirmation | Awaiting cost confirmation |
Revision mismatches and unconfirmed outside costs surface before they ship, not after.
Illustrative workflow
From RFQ to shipped job, with the revision locked
An illustrative workflow for the front half of a contract shop. Nothing gets quoted until the drawing package is complete; the quote is built on history and current cost; the job packet released to the floor is locked to the revision that was promised. Every stall has an owner instead of a shrug.
Integration considerations
The ERP stays the system of record: customers, sales orders, inventory, invoices. The operational layer reads what it needs and writes back what matters—converted quotes, job actuals, quality results. Drawing and document storage integrates with wherever files already live; customer POs arrive by email or portal and get captured at intake rather than re-keyed. Time capture for estimated-versus-actual can start as simple as a tablet at each work center; machine-data integration is possible but rarely the right first step. Material and outside-operation costs come from vendor quotes and POs, which is why chasing those responses is part of the workflow, not an afterthought.
What better looks like
- Faster, more consistent quoting. Every RFQ has a clock and an owner, and every repeat quote starts from history instead of memory.
- Revision mistakes stop shipping. The rev on the floor is the rev that was quoted, and changes trigger re-quotes before they trigger remakes.
- Promise dates you can defend. Scheduling against real capacity turns due-date conversations from negotiation into information.
- Scrap becomes data. Reason codes and nonconformance trails turn rework from a cost of doing business into a fixable list.
- Pricing from evidence. Estimated-versus-actual visibility means the next quote reflects what the last job really cost.
Do you have this problem?
- Can you list every open RFQ right now, with what it is waiting on and when a response is due?
- When a customer sends a new drawing revision, how do you know every open quote and live job got it?
- Can you see what you quoted a similar part last time—and whether that job actually made money?
- Does your schedule know when a machine, a welder, or an inspector is genuinely unavailable?
- Do scrapped and reworked parts carry a reason code that anyone ever reviews?
- Do you find out a job lost money before or after you quote the repeat order?
If several of these hit home, a Workflow Review will show which handoff to systematize first—and how long an internal tool takes to build sets honest expectations for the first project.
Problems we solve for contract manufacturers
- Production schedulingWhiteboards, optimism, and promise dates nobody can defend.
- Manual quote approvalsEstimates waiting on the one person who knows the numbers.
- Document version controlThe wrong drawing rev on the floor at the wrong time.
- Workflow bottlenecksJobs queuing behind handoffs nobody can see.
- Disconnected spreadsheetsThe estimating workbook that runs the shop and answers to no one.
- Operational reportingEstimated versus actual known only after the month closes.
What we build
- Workflow systemsRFQ intake, approval flows, and handoffs with owners and clocks.
- Document and data workflowsDrawing packages, job packets, and certs tied to the right revision.
- Operational dashboardsCapacity, due-date risk, and job performance in one view.
- Custom internal toolsEstimating aids and schedulers shaped to how your shop works.
- System integrationsERP, file storage, email, and time capture connected into one flow.
Further reading
- How to find the workflow worth automating firstPick the first build by cost of the handoff, not volume of the complaint.
- When a spreadsheet becomes business-critical softwareThe estimating workbook already is software—it just has no safety rails.
- Why your ERP is not your operating systemRecording jobs and running jobs are different jobs.
Questions contract manufacturers ask us
- ERP scheduling modules assume clean routings, disciplined data entry, and a dedicated planner keeping everything current. Most contract shops have none of those, so the module gets bypassed and the real schedule moves to a whiteboard. We build the layer the floor actually uses—capacity, due-date risk, and job status the way your leads think about it—and feed the results back to the ERP rather than replacing it.
- Yes. An intake system does not force customers to change how they send things—it normalizes what arrives. Files get attached to the RFQ, drawing completeness is a checklist (part drawings, specs, quality requirements, revisions), and anything missing becomes a named follow-up with an owner instead of a surprise two weeks later.
- It is the normal starting point. The first win is usually not a cost model—it is capturing history: what you quoted, at what price, whether you won, and what the job actually cost. Once that record exists, estimating from experience gets faster and safer, and a real cost model can grow on top of it if and when you want one.
- No. The ERP stays the system of record for orders, inventory, and invoicing. Praxyt builds the operational layer it never had—RFQ intake, revision control, job packets, scheduling, quality—so records stay where they are and the manual work around them gets a real system.
- Most start at the front of the pipe: RFQ intake and quote history, because quoting speed and consistency touch every job that follows. Job packets and revision control are the other common first build when the pain is on the floor rather than in the office. A Workflow Review maps which handoff costs you the most before anything gets built.
The quote, the revision, and the schedule should be one system—not three versions of the truth.
Bring us one workflow—RFQ intake, job packets, or scheduling—and we will map what a system around it looks like.